Index

Lorenzo Bauzá(puts AI to work on live construction projects)

Architect and project manager / Jeddah, Saudi Arabia / Portfolio 2026

Open the working model

LinkedIn / lorenzo.bauza.m@gmail.com

00Cover
Contents
  1. 02ProfileWho I am, in one page
  2. 03LedgerA coordination system, drawn as a set of sheets. Working model inside
  3. 04VitruvioAn engine that shows its reasoning
  4. 05Five rulesHow I work with AI on a project
  5. 06ArchitectureEleven sheets: a competition won, housing, houses and research
  6. 07CVEleven years, four countries
  7. 08Back coverGet in touch
01Contents

Profile(an operator, not a software engineer)

I build the tools my own project runs on.

I am an architect with eleven years delivering buildings in Chile, Australia, Spain and Saudi Arabia. Today I manage a contractor's interiors package at a major cultural venue under construction. I work on site and at the factory.

Two years ago I started using AI every day. It changed how I work and how my project reports. I do not write production code by hand. I decide what a tool must do for the people who will use it, direct the AI that builds it, and test it on the job before anyone depends on it.

Role
Architect and project manager
Based in
Jeddah, Saudi Arabia
Experience
11 years, 4 countries
Works with
Claude, Claude Code
Languages
Spanish, English
Available
To relocate. Site-embedded work and heavy travel
02Profile

Ledger(a project kept as a record of events)

Why it matters

  • Built and run on a live construction project, not a demo: it has produced the project's status reports.
  • It solves the trust problem that keeps AI out of construction reporting: every figure traces to the document that proves it, a person confirms every change the AI proposes, and nothing without a source gets published.
  • It is the job of deploying AI on a project, done end to end: understand how the team really works, shape the tool around it, and make it reliable enough to sign.
Type
Coordination system
Year
2026, pilot on a live project
Location
Live project, Saudi Arabia
Role
Concept, direction, operation
Built with
Claude Code

Nothing is edited. Everything is added.

The status of every item lived in spreadsheets that disagreed, email threads and people's heads. Reports were assembled by hand, and nobody could say which document a number came from.

In Ledger every approval, purchase order and email becomes a dated event with its source. The state of each item is rebuilt from that record.

Why email

On a construction project, decisions are made in email: an approval, a rejection, a "please proceed". Every party along the chain (client, main contractor, consultant, our team, suppliers) keeps its own spreadsheet, and those spreadsheets drift apart. They are snapshots; the email is the evidence. So Ledger treats an email as something that happened and a register as something somebody declared. When the two disagree, the email wins: the register's claim is kept but left out of the state, and the gap is opened as a discrepancy.

Why a chain

An item's record only moves forward. Nothing is overwritten: a correction is a new event that names the one it takes back and why. Every event carries its source, so a figure can be traced back, months later, to the document behind it.

I am an architect, so I have drawn it the way I would draw a building: a set of sheets, each with its title block. The pilot's project, client and data are private. Everything drawn here uses an invented hotel; what is shown is the architecture and the method.

Item RS-01, dining table. Six rows of its record, then a report tries to go out.

001 25 AUG SUBMITTAL SENT SUB-007 002 05 SEP SUBMITTAL APPROVED SUB-007 RESPONSE 003 18 SEP SHOP DRAWING SENT SD-006 REV A 004 30 SEP SHOP DRAWING APPROVED SD-006 REV A RESP. 005 28 OCT PURCHASE ORDER ISSUED PO-1007 006 10 NOV 002 TAKEN BACK LETTER L-031
REPORT 3 SUBMITTALS APPROVED 12 TO 11 REASON NONE WRITTEN

Not published

Sheet
L-00
Title
The record
Scale
1 line = 1 fact
Drawn
L. Bauzá, with Claude Code
Project
Hotel Alameda, invented
Nothing goes out without evidence.

Plan. Each area takes the status of its worst item. The numeral is how many items it holds.

Lobby 3 Restaurant 2 Bar 2 Meeting rooms 2 Back of house 1 Ground floor Open to lobby Guest rooms west 2 Spa 2 Guest rooms east 2 Level 1
  • A record does not add up
  • An item has stopped moving
  • Moving normally
4
Items with the architect
4
With our team
7
With suppliers
Sheet
L-01
Title
Plan
Scale
1 area = its worst item
Drawn
L. Bauzá, with Claude Code
Project
Hotel Alameda, invented
Where the job is held, and who holds it, read off the plan instead of a spreadsheet.

Section through item GR-01, bed frame. One layer per document, the latest on top. Thicker layers took longer. 79 days from first submittal to site.

  1. 12 AugSubmittal sentSUB-00110 days
  2. 22 AugSubmittal approvedSUB-001 response10 days
  3. 1 SepShop drawing sentSD-001 rev A10 days
  4. 11 SepShop drawing approvedSD-001 rev A response6 days
  5. 17 SepPurchase order issuedPO-10017 days
  6. 24 SepFabrication startedSupplier email 24 Sep21 days
  7. 15 OctFactory visitVisit report FV-0017 days
  8. 22 OctShippedPacking list PL-0098 days
  9. 30 OctDelivered to siteDelivery note DN-005, 40 of 40Closed

Ground: nothing on record

Sheet
L-02
Title
Section
Scale
1 layer = 1 document
Drawn
L. Bauzá, with Claude Code
Project
Hotel Alameda, invented
Any status traces back to the document that proves it.

Detail. One email, from inbox to record.

  1. From the architect's office, 9 Nov

    “Shop drawing rev B is approved with no further comments. Please proceed.”

    The sentence the draft rests on, quoted word for word.

  2. Draft. Changes a state

    Shop drawing approved for LB-01, reception desk. Source: SD-002 rev B response. After this, the ball would be with our team to issue the purchase order.

    What accepting would change, shown before anyone decides.

  3. Decision

    AcceptRejectDiscard

    A person accepts, rejects with a reason or discards. Only accepting writes to the record.

  4. 074 09 NOV SHOP DRAWING APPROVED SD-002 REV B RESP.

    One new row, linked to its email. Nothing else in the record is touched.

Sheet
L-03
Title
Detail
Scale
1 : 1
Drawn
L. Bauzá, with Claude Code
Project
Hotel Alameda, invented
The email is the evidence; the spreadsheet is just a snapshot.
Site notes from the pilot. Every name and number removed

A figure with no source

A progress percentage, quoted to two decimals, reached a draft report. No event in the record accounted for it. The report did not go out until the figure could name where it came from.

An approval that did not exist

A shop drawing stated that a component followed “the approved submittal”. The material submittal had come back to be revised and resubmitted, and the hardware submittal had never been sent. The pre-review caught it before the drawing went back to the reviewer.

Silence taken as an answer

A register showed a package as awaiting a reply. The emails showed it had never been sent. The record set the claim aside and opened a discrepancy.

Schedule of quantities. Counted on the pilot on 18 November 2026. They measure the tool, not the project.

RefWhat is countedQuantity
S-01Events in the recordWritten in seven weeks7,150
S-02Events linked to the email behind them170 different emails379
S-03Emails classified577
S-04Times a published total went downEach with its reason written in the record3
S-05Regression testsEach one guards against a failure that already happened40
S-06Kinds of output, each with its own generatorEleven produced since October15
Sheet
L-04
Title
Schedule
Scale
Not to scale
Drawn
L. Bauzá, with Claude Code
Project
The pilot, on a live project
These count a tool at work on a live job, not a prototype.
Open the working model

It runs by itself in the browser: no server, no account, no data from any real project.

Read the code on GitHub

Sheet
L-05
Title
Model
Scale
Full size, working
Drawn
L. Bauzá, with Claude Code
Project
Hotel Alameda, invented
Decide eight emails, find the two wrong drafts and try to publish a report that should not go out.

Where it stands

It is a pilot and I am its only operator. It has produced the project's status reports and the preparation for our internal meetings. The office has asked about extending it to other projects.

Not finished

The confirmation inbox is new and I am still its only user. Meeting minutes are generated by separate scripts, outside the main flow. Sealing a report against the record and the source files it was read from is built and tested, but no report has gone out with a seal yet. Opening it to a second user is the next step.

03Ledger

Vitruvio(an engine that shows its reasoning)

Type
AI reasoning engine
Year
2025, in development
Field
Early building feasibility
Role
Founder, direction
Status
Private

What can be built on this site, and why?

Vitruvio reads zoning and building codes and returns the options for a site. Each conclusion is tied to the rule it comes from. When it lacks the data to answer, it says so instead of guessing.

Building it taught me where language models fail on codes and drawings, and how to explain that to a project team in plain terms.

AllowedHousing up to 4 storeys and 14 mSource: zoning plan, residential zone, height article
Allowed2,880 m² of floor area on a 2,400 m² lotSource: floor area ratio of 1.2, same plan
DiscardedOne taller blockReason: exceeds the height limit
DiscardedDetached housesReason: lower residual land value than apartments
Not knownSoil bearing capacityNo soil study on file. No structural claim is made

Example output. Residential lot, La Dehesa, Santiago: an invented site with simplified rules. The engine and its rule base are private.

04Vitruvio

Five rules(how I work with AI on a project)

  1. 1Nothing is typed into a report by hand

    If a number is wrong, fix the evidence and generate the report again. A figure nobody can trace is a figure nobody should sign.

  2. 2The AI proposes, a person confirms

    No update enters the record until someone who knows the job has looked at it.

  3. 3"I don't know" is a valid answer

    A gap that is stated is information. A gap filled in silently is a defect.

  4. 4Decide what correct means before building

    The acceptance criteria are written first, and the build is held to them.

  5. 5Adoption happens at someone's desk

    A tool sticks when it is shaped around how a person already works.

05Five rules

Architecture(what I drew before I built software)

Type
Buildings, competitions, research
Places
Chile, South Africa, Australia
Drawn in
Revit, Rhino, AutoCAD
Role
Design and documentation
Sheets
Eleven

Before the software, the drawings.

I trained and worked as an architect for a decade before I built any tool. These are eleven works from that time: a competition won, housing drawn in an office, two houses, and research into clay, shelter and farm waste.

They are printed in black, as drawn. Where the design belongs to an office or to another architect, the title block says so. Select any drawing to open it larger.

Competitions and office work
Bus terminal seen from the road: a long canopy with a clock tower over desert planting
Exterior view
Axonometric drawing of the terminal, its platforms and forecourt
Axonometric
Plan of the terminal with the area schedule and a view of the bus platforms
Plan, areas and view of the platforms
Long sections of the terminal above two interior views
Sections and interior views
Sheet
A-01
Title
Bus terminal
Place
Chañaral, Chile, 2021
Kind
Public competition, first prize
Drawn
L. Bauzá, for MM-AC Arquitectos
First prize. The office was awarded the contract; the design was mine.
Four buildings of the ensemble seen in elevation
The ensemble
Site plan with the buildings set among courtyards and an existing church
Site plan
Typical apartment floor plan
Typical floor
View of one of the housing towers with the mountains behind
Housing tower
Sheet
A-02
Title
Jardines de Las Condes
Place
Santiago, Chile
Kind
Housing, offices and an existing church
Office
Squella Arquitectos. I worked on the drawings
Two housing buildings, an office building and an existing church, tied together by a run of courtyards.
The school seen from the approach road, low roofs against the hills
Approach
Covered sports court under a steel truss roof
Covered court
Exploded axonometric of the school, layer by layer
Exploded axonometric
Ground floor plan of the school
Plan
Sheet
A-03
Title
Rural school
Place
Santa Cruz, Chile
Kind
Public tender, renovation
Drawn
L. Bauzá
A public tender to renovate a rural school, with a covered court for sport.
Houses
The house on its plinth, seen from below
View from below
The house seen across the slope
From the slope
Plans of the upper and lower floors
Upper and lower floors
Sheet
A-04
Title
Valdivia Norte house
Place
Limarí Valley, Chile
Kind
House
Drawn
L. Bauzá
Two equal main bedrooms at the ends of a butterfly-shaped volume, the shared rooms between them, all raised on a plinth.
Axonometric of the house set against the rock and the contours of the hillside
Axonometric
Floor plan of the house with the outline of the rock
Plan
Section through the house and the slope
Section
Sheet
A-05
Title
Arjan house
Place
South Africa
Kind
House for a climber
Drawn
L. Bauzá
Laid out around the rocks already on the site: the shower sits behind one, and the bedroom window frames another.
Research and studies
Interior of the clay vault with brick makers standing at its open end
Inside the vault
Axonometric of three vault shells between two frames
Axonometric of the shells
Construction detail of the vault where it meets the ground
Detail at the springing
Cross section of the vault
Cross section
Sheet
A-06
Title
Experimental vault
Place
Paniahue, Santa Cruz, Chile
Kind
Research: clay fired in place
Drawn
L. Bauzá
A vault whose clay is baked where it stands: a metal mesh, heated by modified microwave transducers, fires the clay applied to it.
The centre seen from the road: one long roof over a dark volume
View from the road
Three sections through the building
Sections
Four plans: education, work, fabrication and recreation
Four programmes
Sheet
A-07
Title
C.I.D.A.I.D.A.
Place
Talca, Chile
Kind
Research centre for building with farm waste
Drawn
L. Bauzá
Teaching, work, fabrication and leisure under one roof, around a core where materials made from farm waste are developed.
The shelter assembled, taken apart into panels, and packed flat with its dimensions
Assembled, in parts and packed
Six steps of the shelter unfolding
Folding sequence
Sheet
A-08
Title
Fast-pack shelter
Material
Glass-fibre reinforced polyester
Kind
Emergency shelter
Drawn
L. Bauzá
An emergency shelter that folds and stacks like a plastic fruit crate.
A city skyline on top of a drifting iceberg, with an airship above
Photomontage
Sheet
A-09
Title
Iceberg city
Year
2012
Kind
Photomontage
Drawn
L. Bauzá
Manhattan on a drifting iceberg, made when an ice mass the size of the island broke off the Petermann Glacier.
Two elevations of the hut, timber boards and a rusted steel volume
Elevations
Two more elevations of the hut
Elevations
Plans of the two floors of the hut
Lower and upper floors
Sheet
A-10
Title
Meeting place
Kind
Hut around a fire
Drawn
L. Bauzá
A hut organised around a fire: brazier and grill at the centre, shared rooms below, private rooms above.
Two cutaway axonometrics of a long single-storey house
House by Smiljan Radic, cut twice
Exploded axonometric of a small timber house
House at the Bay of Fires, taken apart
Sheet
A-11
Title
Two houses, rebuilt in Revit
Places
Chile and Tasmania
Kind
BIM study
Credit
Design: Smiljan Radic; Tim Penny. Model: L. Bauzá
Houses by other architects, one measured on site and one read from photographs, modelled to learn how they are put together.
06Architecture

CV(eleven years, four countries)

  1. 2026 to now / JeddahProject manager, interiors package

    HESCO Engineering Services, HID Group. Contractor side

    Based on site at a major cultural venue under construction, with visits to the factory. I run submittals, shop drawings, technical queries, purchase orders, logistics and site-required dates.

    I moved the package's status reporting onto a tracker I built with AI tools, so every figure traces to a source document.

  2. 2025 to nowFounder, Vitruvio

    An AI reasoning engine for building feasibility. I direct the build with AI coding agents and write the acceptance criteria before each release.

  3. 2024 to 2026 / JeddahDesign architect

    HESCO Engineering Services

    Design packages for large palace and master-plan projects under confidentiality: floor plans, spatial organisation and concept development within the design team.

  4. 2024 / ValenciaFreelance architect, residential renovation

    For Epick Bricks

    Delivered interior renovations for a property investment company as an independent architect: design, client relations and trade coordination on site.

  5. 2023 to 2024 / ValenciaProject manager and designer

    Marvel Rocks

    Took large themed leisure venues from concept through fabrication: assembly documents, CNC cutting of components, and on-site supervision of fabricators and installers.

  6. 2020 to 2023 / SantiagoProject manager, residential renovation

    LGV Constructora, today Flipeame

    Ran more than ten apartment projects for a company that sourced, bought, renovated and sold homes, from acquisition and design to site works and sale, coordinating crews and suppliers.

  7. 2021 / SantiagoArchitect, public competitions

    MM-AC Arquitectos

    Sole designer of the proposal that won first prize in the public competition for the Chañaral bus terminal, which earned the office the contract. Produced its drawings, construction documents and specifications.

  8. 2018 to 2020 / SantiagoArchitect, high-rise housing

    Squella Arquitectos

    Designed and documented high-rise housing for major developers, from concept design to permitting.

  9. 2016 to 2018 / SydneyArchitect, carpenter and joiner

    Uncle Bob Carpentry

    Site carpentry and workshop joinery in Australia: timber-framed houses, and bespoke interiors and furniture made by hand, from drawing to installed piece.

  10. 2014 to 2016 / ChileArchitect, early roles

    Diark, Municipality of Lago Verde, S3 Arquitectos

    Retail, renovation and subsidised-housing projects: drawings, municipal permits and site follow-up.

Education

Architect, Universidad Diego Portales, Santiago, 2008 to 2015

BIM Diploma (Revit), Pontificia Universidad Católica de Chile, 2016

Tools

Claude, Claude Code

Revit, Rhino, Grasshopper, AutoCAD, SketchUp, Excel

Languages

Spanish, native

English, advanced

07CV